33 articles for “project schedule”
-
Study on Fiber Reinforced Composite Material Cost in Construction Project
Abstract: The primary goal of this research paper is to identify the major causes of fibre reinforced composite material cost overruns in Indian construction projects, as well as the critical success factors that aid in the avoidance of such costs. The critical success factors is reviewed by existing literature. They are used to generate survey and interview questions. The fiber reinforced materials projects using proposed hypothesis and lack of certain critical …
Published in Journal of Polymer & Composites · Vol. 13, Issue 2, 2025 · pp. 459–466 Read article
-
Comparative Study of Time Slice Windows Analysis and Impacted As-Planned Analysis for Data Center Construction Projects Using Primavera P6 24.12 Version
Abstract: Data centers are IT infrastructure that needs to be precisely scheduled and coordinated. Significant financial losses and operational failures may result from building delays. Stakeholders can assign blame and comprehend the reasons behind delays with the aid of forensic delay analysis. Because of their unique approaches and legal acceptability, TSWA, and IAPA are commonly used among the many strategies. These methods provide various ways to analyze project schedules and pinpoint …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 1, 2026 · pp. 33–51 Read article
-
Safety Analysis of High Rise Buildings
Abstract: In the construction sector, safety and accidents are important factors that have a big impact on the well-being of workers, project schedules, and project overall expenses. In addition to being required by law, putting safety first in construction is a wise strategic move with broad ramifications. The comparative safety study of high-rise structures presented in this work focuses on assessing how safety precautions, construction costs, and project schedules interact. The …
Published in Journal of Construction Engineering, Technology & Management · Vol. 14, Issue 1, 2024 · pp. 22–34 Read article
-
Integration of Revit to Microsoft Project for Construction Project Management: A Comparative Analysis of Scheduling and Resource Allocation
Abstract: Building Information Modelling (BIM) has revolutionized the construction sector by having architectural, structural, and mechanical design on one 3D platform. Autodesk Revit application enables real-time updates and changes without increasing errors and omissions. Its parametric nature allows users to develop intelligent models, enhancing decision-making, resource allocation, and cost estimation. Revit's visual representation allows effective coordination and communication with stakeholders, promoting a higher degree of client satisfaction. The application and benefits …
Published in Journal of Construction Engineering, Technology & Management · Vol. 15, Issue 3, 2025 · pp. 13–46 Read article
-
Assessing the Integration of Information Technology Across Key Areas and Functions in Quantity Surveying Professional Practice
Abstract: Information Technology (IT) has had an immeasurable impact on business systems and processes, in all spheres of the economy including construction. The study assesses the integration of technology within the construction sector by Quantity Surveying professionals in Nigeria. This is against the backdrop that the integration of technology into the practice of Quantity Surveying has had a profound effect on the profession in Nigeria and globally. Technological revolution has fundamentally …
Published in Research & Reviews : Journal of Statistics · Vol. 14, Issue 1, 2025 · pp. 1–10 Read article
-
Revolutionizing School Schedules: An Arduino-Based Automatic Class Bell System with Real-Time Precision
Abstract: A sound that evokes nostalgia, signals transitions, and dictates the rhythm of academic life. However,the traditional reliance on manual bell ringing is prone to human error, inconsistencies, and inflexibility. This work explores the design and implementation of an Arduino-based automatic class bell system leveraging a Real-Time Clock (RTC) module to provide accurate and reliable bell timing. This system offers a significant upgrade over manual systems, streamlining school schedules and improving …
Published in Journal of Control & Instrumentation · Vol. 16, Issue 2, 2025 · pp. 35–44 Read article
-
EduTest Portal Using Java with Spring Boot
Abstract: The "EduTest Portal" is an innovative and comprehensive web-based platform developed to transform and modernize the traditional examination system. It utilizes modern technologies to provide a secure, efficient, and highly user-friendly environment for conducting online assessments. This platform is designed to overcome the common drawbacks of manual exam procedures, such as excessive paperwork, time consumption, human error in grading, and the high cost of administration. EduTest Portal offers a streamlined …
Published in Recent Trends in Programming languages · Vol. 12, Issue 2, 2025 · pp. 07–16 Read article
-
Analysis of Project Management Optimization Using CPM and PERT in a Dynamic Business Environment
Abstract: In the current fast-changing business environment, organizations must remain agile and strategically responsive to unpredictable challenges such as supply chain disruptions, shifting consumer demands, and evolving market trends. Project management techniques like the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT) serve as valuable tools in helping businesses manage these complexities effectively. CPM is a time-focused method that identifies the longest sequence of dependent tasks in …
Published in Journal of Construction Engineering, Technology & Management · Vol. 15, Issue 3, 2025 Read article
-
Communication Pathways and Project Success: Analyzing Stakeholder Coordination Impacts on Construction Outcomes
Abstract: It is very critical to have effective communication and coordination among stakeholders for the successful delivery of the projects. Effective communication keeps stakeholders well-informed about project progress, promoting transparency, trust, and collaboration. Coordination ensures that responsibilities and resources are efficiently allocated, reducing the risk of misunderstandings and enhancing decision-making processes. Inadequate stakeholder engagement can lead to confusion, delays, rework, and the failure to meet key project milestones. The impact of …
Published in Journal of Construction Engineering, Technology & Management · Vol. 15, Issue 3, 2025 · pp. 104–126 Read article
-
A Memory-Based Genetic Algorithm for Optimization of Power Generation in a Microgrid
Abstract: Due to advancement in power electronics field, it is becoming more feasible to integrate renewable energy into power grid. Renewable energy sources are prompting more and more small investors to invest in generation and distribution of renewable energy at microgrid level. The increased competition requires energy producers to offer energy at minimum possible cost to gain the confidence of consumers, which needs efficient methods to schedule energy generation among the …
Published in Journal of Semiconductor Devices and Circuits · Vol. 12, Issue 3, 2025 · pp. 29–38 Read article
-
Identification and Evaluation of Safety Factors in Construction Industry Using Fuzzy Reasoning Technique
Abstract: Modern construction projects, characterized by their complexity and uniqueness, are inherently susceptible to various risks. These risks represent uncertain events that may arise during the project's life cycle, potentially influencing its objectives either positively or negatively. Positive risks are referred to as opportunities, while negative risks are identified as threats. To effectively harness these opportunities and mitigate threats, the implementation of Risk Management is essential. A novel theoretical framework known …
Published in Journal of Industrial Safety Engineering · Vol. 12, Issue 3, 2025 · pp. 7–12 Read article
-
Streamlining Transport Management: The Evolution of Machine-to-Machine Communication
Abstract: Every transportation industry, as is well known, has its own paperwork that employees of the organisation can complete. There is a lot of paperwork in the transport business. The user will be able to oversee multiple tasks with this way. Additionally, the user can track orders and inspect their goods. By using this method, the user will be able to work more efficiently and save time and energy. It involves …
Published in International Journal of Electrical and Communication Engineering Technology · Vol. 1, Issue 2, 2023 · pp. 21–26 Read article
-
Study of Cost Overrun in Repair & Rehabilitation Projects in India
Abstract: In broad sense, the word "rehabilitation" suggested putting a building back to how it was before. The specialized area of repair and rehabilitation engineering necessitates knowledge and skills that go beyond those needed for design and construction engineering. Repair and rehabilitation projects are significantly more challenging and more complicated than new construction projects. It is vital to take a methodical approach to structural deterioration, and technology management and economics should …
Published in International Journal of Architectural Design and Planning Read article
-
Study and Analysis of Labour Management on Building Construction Project
Abstract: The term "labour management" describes a business's procedures and guidelines for adhering to national and international labour laws as well as client demands. In order to increase labour productivity, this study sought to measure the efficacy of a number of implemented management strategies, such as resource scheduling, advanced construction methods, labour management, training, communication, supervision, planning, and incentive programs. Labour management is an important parameter considered on site because the …
Published in Journal of Structural Engineering and Management · Vol. 11, Issue 2, 2024 · pp. 20–31 Read article
-
Advanced Airline Operations Control System Using NodeJS
Abstract: This research paper presents the development of an Advanced Airline Operations Control System (AAOCS) using NodeJS, a lightweight and scalable JavaScript runtime environment. Leveraging NodeJS's event-driven architecture and non-blocking I/O model, the system facilitates efficient management of flight operations, crew scheduling, resource allocation, and real-time decision-making in the aviation industry. Key features include real-time decision support tools, a microservices-based architecture for scalability, integration with external data sources and APIs, and …
Published in Journal of Control & Instrumentation · Vol. 15, Issue 1, 2024 · pp. 45–51 Read article
-
Advanced Collaboration and Project Management Platform
Abstract: The growing dependence of employees on remote and hybrid working modes worldwide has driven a demand for modern collaborative platforms to optimize project management. All organizations are keen on solutions that enhance workflow efficiency, facilitate seamless communications, and boost overall productivity. The study presents an advancement in project management collaboration and aims at finding solutions to meet those demands, using API integration. The study explores the extent to which API …
Published in Journal of Web Engineering & Technology · Vol. 12, Issue 2, 2025 · pp. 11–18 Read article
-
Digital Transformation of Urban Infrastructure with the Help of AI Guardians
Abstract: The construction industry continues to face challenges related to quality control, safety protocols, and meeting project deadlines. These issues often result in significant cost overruns and project delays. Traditional inspection and site management approaches rely heavily on manual work and individual judgment. As a result, human errors can easily occur, and these methods provide only limited snapshots of site conditions over time. This paper presents a comprehensive framework that uses …
Published in Recent Trends in Civil Engineering & Technology · Vol. 16, Issue 1, 2026 · pp. 16–25 Read article
-
An Empirical Analysis of Cost, Time, and Quality Relationships Using Correlation and Regression Techniques
Abstract: Cost, time, and quality have been recognized as the three key dimensions that determine construction project performance and are commonly represented through the "Project Management Triangle." However, despite their theoretical linkage, there is limited empirical evidence to quantify the nature of their relationships, particularly within developing construction markets. This paper seeks to contribute to addressing this shortfall by investigating the specific influence of cost and schedule variations upon quality outcomes …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 1, 2026 · pp. 52–60 Read article
-
Evaluating Delay Impacts: From Root Cause Analysis to Dispute Resolution
Abstract: Construction projects inherently involve complex coordination among multiple stakeholders, interdependent tasks, and unpredictable external challenges, which frequently cause schedule overruns and disputes. Traditional contractual mechanisms—such as extensions of time (EoT), liquidated damages, and force majeure clauses—serve to define responsibilities, allocate risk, and establish formal dispute pathways when delays arise. For example, EoT provisions protect contractors from penalties when delays are beyond their control, provided proper notice and evidence are submitted …
Published in Journal of Structural Engineering and Management · Vol. 12, Issue 3, 2025 · pp. 11–25 Read article
-
Tea Waste Recovery System
Abstract: The Tea Waste Recovery Management System aims to solve the problem of waste from tea shops, which can harm the environment and waste valuable resources. Every day, tea shops throw away large amounts of used tea powder, causing pollution and missing the chance to recycle these organic materials. If tea waste is not managed properly, it can pile up in landfills, releasing harmful gases into the air. This not only …
Published in Journal of Energy, Environment & Carbon Credits · Vol. 15, Issue 2, 2025 · pp. 1–7 Read article