Evaluating Delay Impacts: From Root Cause Analysis to Dispute Resolution
Abstract: Construction projects inherently involve complex coordination among multiple stakeholders, interdependent tasks, and unpredictable external challenges, which frequently cause schedule overruns and disputes. Traditional contractual mechanisms—such as extensions of time (EoT), liquidated damages, and force majeure clauses—serve to define responsibilities, allocate risk, and establish formal dispute pathways when delays arise. For example, EoT provisions protect contractors from penalties when delays are beyond their control, provided proper notice and evidence are submitted …
Published in Journal of Structural Engineering and Management · Vol. 12, Issue 3, 2025 · pp. 11–25 Read article
-
Comparative Study of Time Slice Windows Analysis and Impacted As-Planned Analysis for Data Center Construction Projects Using Primavera P6 24.12 Version
Abstract: Data centers are IT infrastructure that needs to be precisely scheduled and coordinated. Significant financial losses and operational failures may result from building delays. Stakeholders can assign blame and comprehend the reasons behind delays with the aid of forensic delay analysis. Because of their unique approaches and legal acceptability, TSWA, and IAPA are commonly used among the many strategies. These methods provide various ways to analyze project schedules and pinpoint …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 1, 2026 · pp. 33–51 Read article
-
Identification and Assessment of the Factors causing Cost Overrun in Housing Projects
Abstract: Poor cost performance is a major problem in construction industry, especially in developing countries like India. Statistics reveal that majority of the projects faces the issue of cost overrun. The interrelationship between the causes of cost overrun and stakeholders has not been explored yet. The aim of the research is to minimize the effects of project cost overrun. The objective of the study is to categorize and rank the potential …
Published in International Journal of Urban Design and Development · Vol. 1, Issue 1, 2023 · pp. 17–34 Read article
-
Lean Design Management as a Solution for Delays in Design Phase
Abstract: The results of this study reveal that traditional project management has a negative impact on the performance of construction projects and addresses its weaknesses in the design stage. Poor quality documentation from poorly managed design projects leads to budget overspending, delay, rework, and disputes. This paper emphasizes the importance of technical cooperation and highlights the lack of focus on value and waste in design development. Lean Design Management (LDM) is …
Published in International Journal of Architectural Design and Planning · Vol. 2, Issue 1, 2024 · pp. 30–39 Read article
-
Socio-Economic Impacts of Rivers State Government Ring Road Project on Residents of Port Harcourt Municipality
Abstract: As nations strive towards improving the socio-economic well-being of its citizens, efficient transportation system in the form of ring roads have become a desideratum for reducing traffic congestion and enhancing movement of goods and services. The paper examines the impacts a ring road can have on residents of project area with emphasis on Port Harcourt. The Hazard and Effect Management Process (HEMP) technique developed by SHELL was used to examine …
Published in International Journal of Rural and Regional Development · Vol. 3, Issue 1, 2025 · pp. 42–51 Read article
-
Digital Transformation of Urban Infrastructure with the Help of AI Guardians
Abstract: The construction industry continues to face challenges related to quality control, safety protocols, and meeting project deadlines. These issues often result in significant cost overruns and project delays. Traditional inspection and site management approaches rely heavily on manual work and individual judgment. As a result, human errors can easily occur, and these methods provide only limited snapshots of site conditions over time. This paper presents a comprehensive framework that uses …
Published in Recent Trends in Civil Engineering & Technology · Vol. 16, Issue 1, 2026 · pp. 16–25 Read article
-
Communication Pathways and Project Success: Analyzing Stakeholder Coordination Impacts on Construction Outcomes
Abstract: It is very critical to have effective communication and coordination among stakeholders for the successful delivery of the projects. Effective communication keeps stakeholders well-informed about project progress, promoting transparency, trust, and collaboration. Coordination ensures that responsibilities and resources are efficiently allocated, reducing the risk of misunderstandings and enhancing decision-making processes. Inadequate stakeholder engagement can lead to confusion, delays, rework, and the failure to meet key project milestones. The impact of …
Published in Journal of Construction Engineering, Technology & Management · Vol. 15, Issue 3, 2025 · pp. 104–126 Read article
-
Analysis of critical constraint factors affecting the performance of Transportation projects
Abstract: Infrastructure is a country's biggest source of economic growth, which is made up of a variety of facilities and processes. It includes all the amenities and services required for urbanization, economic expansion, improved quality of life, and thriving companies. Transportation is one of the most important industries for any nation's economy, but constraints exist in all working environments. A construction constraint is a condition that makes it difficult to achieve …
Published in International Journal of Urban Design and Development · Vol. 1, Issue 1, 2023 · pp. 54–78 Read article
-
Design & Implementation of 16-BIT MAC Unit Using Vedic Mathematics
Abstract: Multiply and Accumulate (MAC) units are essential parts of digital systems, particularly in embedded systems, digital signal processing (DSP), and image processing. The performance of these systems is significantly impacted by how well the multiplication process works. The design and construction of a fast 16-bit MAC unit utilizing Vedic mathematics are presented in this study.The proposed design utilizes the Urdhva Tiryagbhyam sutra to perform multiplication in a parallel manner, reducing …
Published in Journal of VLSI Design Tools and Technology · Vol. 16, Issue 1, 2026 · pp. 52–58 Read article
-
Novel Strategic Framework for AI-Driven Discovery and Development of Smart and Sustainable Polymers in Healthcare
Abstract: The development of new smart and sustainable polymers is emerging as a priority of new health care innovative development, but event before it may be actualized, the usual culprit is the delay and unproductive execution of the old-fashioned R&D efforts. The current paper proposes a strategic plan which will solve all these shortcomings and speed up the material discovery process by using Artificial Intelligence (AI) and Machine Learning (ML). The …
Published in Journal of Polymer & Composites · Vol. 14, Issue 1, 2026 · pp. 1535–1550 Read article
-
Design and Simulation of Full Adder-Based CMOS 4-2 Compressor using CMOS XOR-XNOR Logic
Abstract: This study utilizes the recent development of CMOS transistors to construct an energy-efficient Full adder-based CMOS 4-2 compressor. The CMOS Exclusive-OR-Exclusive-NOR component and multiplexer used in the transmission logic of the novel CMOS compressor include eight transistors. The XOR-XNOR logic style is the most efficient and effective due to its speed and reduced power consumption. Utilizing an operational supply voltage of 0.7 V and 90nm CMOS technology, the Cadence Virtuoso …
Published in Recent Trends in Electronics Communication Systems · Vol. 12, Issue 3, 2025 · pp. 1–8 Read article