Search
42 articles for “Construction schedule”
-
Construction Safety Enhancement in Thermal Power Plant using Data Analysis and Statistics
Abstract: Each activity of construction industries is associated with its risk that requires more focus to mitigate it as soon as possible to make work area safer. To mitigate these risks, site execution team and site safety team jointly inspect the site through various site auditing tools and identified all hazards and risk on scheduled basis. After documented all these hazards, control measures are decided to implement at site to prevent …
Published in Journal of Industrial Safety Engineering · Vol. 10, Issue 2, 2023 · pp. 8–16 Read article
-
Time-Cost Trade-off and Constraint Resource Scheduling Considering Overtime for Activity Expedition
Abstract: Project cost, duration and resources are three important parameters of a construction project. There is always a trade-off between project time and cost. While a lot of techniques are available to optimize the project time and cost in normal conditions, less effort is done to optimize them in a resource constraint conditions. This paper is focusing on a nonlinear integer framework for time-cost trade-off (TCT) and constraint resource scheduling (RCS) …
Published in Recent Trends in Civil Engineering & Technology · Vol. 6, Issue 2, 2016 · pp. 30–36 Read article
-
Comparative Study of Time Slice Windows Analysis and Impacted As-Planned Analysis for Data Center Construction Projects Using Primavera P6 24.12 Version
Abstract: Data centers are IT infrastructure that needs to be precisely scheduled and coordinated. Significant financial losses and operational failures may result from building delays. Stakeholders can assign blame and comprehend the reasons behind delays with the aid of forensic delay analysis. Because of their unique approaches and legal acceptability, TSWA, and IAPA are commonly used among the many strategies. These methods provide various ways to analyze project schedules and pinpoint …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 1, 2026 · pp. 33–51 Read article
-
An Investigation into delay factors in building construction projects; Case of Hargeisa, Somaliland
Abstract: Since the construction industry contributes to the development and growth of the country’s economy, it is indicated as one of the crucial sectors. However, this industry frequently faces delay problems, which have an impact on the progress of industry-related projects and their performance. Identifying the reasons for the delay in building construction projects can save money also time. It also improves the project’s performance and ensures its successful completion. Therefore, …
Published in Journal of Construction Engineering, Technology & Management · Vol. 12, Issue 2, 2022 · pp. 30–41 Read article
-
Empirical Evaluation of Performance ofConstruction Management at-Risk (CM at-Risk) Project Delivery System With and Without Agency-CM
Abstract: A project delivery system is a comprehensive process of assigning the contractual responsibilities for designing and constructing a project. Design-Bid-Build (D-B-B), Design-Build (D-B), and Construction Management at risk (CM-at-Risk) are the three principal project delivery systems. Agency CM is as a construction management system, and is a way to manage the process of construction.Agency-CM doesn’t take any performance risk in guaranteeing project cost, project schedule and project quality. Generally Agency …
Published in Journal of Construction Engineering, Technology & Management · Vol. 3, Issue 1, 2013 · pp. 13–25 Read article
-
Delay factors in construction projects effecting cost & time
Abstract: In construction industry one of the most common problems are cost over-run and delay. Delay can be minimized with the help of optimal scheduling techniques with the help of scheduling software’s. Delay means we are not meeting the deadline on time which results cost and time overrun. For the economic development of India construction segment is one of the sectors that provides important component. It is considered one of the …
Published in Recent Trends in Civil Engineering & Technology · Vol. 8, Issue 3, 2018 · pp. 6–13 Read article
-
Study of Material Management Techniques on Construction Project
Abstract: Material management is a critical component of the construction industry. As such, organizations need to understand the effects of congruous materials management techniques on the efficacy of project execution. An opportunity implemented materials management program can achieve the timely flow of materials and equipment to the jobsite, and thus facilitate ameliorated work face orchestrating, incremented labor productivity, better schedules and lower project costs. Materials management is an important function in …
Published in Journal of Construction Engineering, Technology & Management · Vol. 5, Issue 2, 2015 · pp. 22–27 Read article
-
A Proposed Management System for Efficient Construction Site Productivity
Abstract: The concept of on-site construction productivity has long been a major concern of researchers and construction companies. The factors that influence construction site productivity vary according to the project environment, project type, staff, management, and other related factors and/or variables. In this study, the main factors that are believed influencing construction site productivity are reviewed as environmental, manpower, management, and site. A field survey has evaluated site productivity of 150 …
Published in Journal of Construction Engineering, Technology & Management · Vol. 4, Issue 3, 2014 · pp. 20–30 Read article
-
Evaluating Delay Impacts: From Root Cause Analysis to Dispute Resolution
Abstract: Construction projects inherently involve complex coordination among multiple stakeholders, interdependent tasks, and unpredictable external challenges, which frequently cause schedule overruns and disputes. Traditional contractual mechanisms—such as extensions of time (EoT), liquidated damages, and force majeure clauses—serve to define responsibilities, allocate risk, and establish formal dispute pathways when delays arise. For example, EoT provisions protect contractors from penalties when delays are beyond their control, provided proper notice and evidence are submitted …
Published in Journal of Structural Engineering and Management · Vol. 12, Issue 3, 2025 · pp. 11–25 Read article
-
An Empirical Analysis of Cost, Time, and Quality Relationships Using Correlation and Regression Techniques
Abstract: Cost, time, and quality have been recognized as the three key dimensions that determine construction project performance and are commonly represented through the "Project Management Triangle." However, despite their theoretical linkage, there is limited empirical evidence to quantify the nature of their relationships, particularly within developing construction markets. This paper seeks to contribute to addressing this shortfall by investigating the specific influence of cost and schedule variations upon quality outcomes …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 1, 2026 · pp. 52–60 Read article
-
Identifying Factors Leading to Cost Overrun in Construction Projects in Jordan
Abstract: The problem of cost overrun in construction industry is common worldwide and the construction industry in Jordan is no exception. The main objective of the study reported in this paper was to identify the causes of cost overrun in construction projects in Jordan. A comprehensive literature review from various sources was made to carry out the study. A questionnaire survey was conducted to find the causes of cost overrun related …
Published in Journal of Construction Engineering, Technology & Management · Vol. 5, Issue 3, 2015 · pp. 25–33 Read article
-
Communication Pathways and Project Success: Analyzing Stakeholder Coordination Impacts on Construction Outcomes
Abstract: It is very critical to have effective communication and coordination among stakeholders for the successful delivery of the projects. Effective communication keeps stakeholders well-informed about project progress, promoting transparency, trust, and collaboration. Coordination ensures that responsibilities and resources are efficiently allocated, reducing the risk of misunderstandings and enhancing decision-making processes. Inadequate stakeholder engagement can lead to confusion, delays, rework, and the failure to meet key project milestones. The impact of …
Published in Journal of Construction Engineering, Technology & Management · Vol. 15, Issue 3, 2025 · pp. 104–126 Read article
-
Risk Based Estimation in Construction Projects
Abstract: Final cost of a project is always subjected to many variables and assumptions. A single value estimate only represents one of the many possible conditions that can arise in the future. Hence a cost estimate should be represented as a range of values rather than a single value. Construction projects are complex project which involve many uncertainties. Uncertainties in activities can be a threat to the project objective or an …
Published in Journal of Construction Engineering, Technology & Management · Vol. 12, Issue 3, 2022 · pp. 24–36 Read article
-
Study of Cost Overrun in Repair & Rehabilitation Projects in India
Abstract: In broad sense, the word "rehabilitation" suggested putting a building back to how it was before. The specialized area of repair and rehabilitation engineering necessitates knowledge and skills that go beyond those needed for design and construction engineering. Repair and rehabilitation projects are significantly more challenging and more complicated than new construction projects. It is vital to take a methodical approach to structural deterioration, and technology management and economics should …
Published in International Journal of Architectural Design and Planning Read article
-
Budgetary Control and Timely Completion of Civil Engineering Projects Through Financial Management
Abstract: Financial management is critical for dealing with time delays and cost overruns in civil engineering. The methodology adopted in this study is questionnaires distributed to different construction professionals and surveys from some sites. Professionals consulted include engineers, contractors, and clients. Results show that most projects encounter time wastages, insufficient materials, and mismanagement of resources. Numerous time and cost management strategies assist in preventing cost overrun and schedule extension in civil …
Published in Recent Trends in Civil Engineering & Technology · Vol. 12, Issue 3, 2022 · pp. 10–19 Read article
-
DESIGN MANAGEMENT FOR EPC CONTRACT
Abstract: Design management can be defined as the effective management of design process, design planning, cost-effective design, allocation of design liability, and co-ordination of project participants during design process. The fundamental principle of design management is to provide a co-ordinated design on time by fulfilling client’s requirement. Co-ordination among designer, client and contractor is a widespread problem in the construction industry.Significant advances have made for EPC contract; but only a few …
Published in Journal of Construction Engineering, Technology & Management · Vol. 9, Issue 1, 2019 · pp. 21–25 Read article
-
Assessment of Agricultural Potentials and Constraints of Natural Resources Management for Research Implementation in Gedeo Zone South Ethiopia Region
Abstract: This study aimed at assessing agricultural potentials and constraints of natural resources management for research implementation in Gedeo zone south Ethiopia Region. The result indicates that the use of organic and inorganic fertilizers was not efficient and the crop yield was decreasing from year to year. Use of organic fertilizer is for only high value crops of enset and coffee without determined rate. Farmers were not practiced organic fertilizers like …
Published in Research & Reviews : Journal of Agricultural Science and Technology · Vol. 15, Issue 2, 2026 · pp. 82–93 Read article
-
Software Development Using Component Based Testing
Abstract: Segment Testing is utilized in Software advancement. Right now, part will be tried. Principle Reason for utilizing Component testing is reuse. In Component Testing less assets utilized for growing new programming. Various sorts of Component gathered and incorporated for programming improvement. It is decreased advancement time and improved programming quality and make moves toward interactional. Testing is performed not exclusively to submit the basic programming mistake free in any case …
Published in Journal of Microcontroller Engineering and Applications · Vol. 8, Issue 3, 2021 · pp. 22–26 Read article
-
Development of Fast and Power Efficient Elevator
Abstract: The rapid urbanization and vertical expansion of cities have led to a surge in the construction of high-rise buildings, creating a growing demand for elevator systems that are not only fast but also energy efficient. As population density in metropolitan areas increases, the pressure on vertical transportation systems intensifies, highlighting the need for solutions that can handle high passenger traffic without compromising performance or sustainability. This study presents the development …
Published in International Journal of Advanced Robotics and Automation Technology · Vol. 3, Issue 2, 2025 · pp. 32–41 Read article
-
Assessing the Integration of Information Technology Across Key Areas and Functions in Quantity Surveying Professional Practice
Abstract: Information Technology (IT) has had an immeasurable impact on business systems and processes, in all spheres of the economy including construction. The study assesses the integration of technology within the construction sector by Quantity Surveying professionals in Nigeria. This is against the backdrop that the integration of technology into the practice of Quantity Surveying has had a profound effect on the profession in Nigeria and globally. Technological revolution has fundamentally …
Published in Research & Reviews : Journal of Statistics · Vol. 14, Issue 1, 2025 · pp. 1–10 Read article