Budgetary Control and Timely Completion of Civil Engineering Projects Through Financial Management
Abstract: Financial management is critical for dealing with time delays and cost overruns in civil engineering. The methodology adopted in this study is questionnaires distributed to different construction professionals and surveys from some sites. Professionals consulted include engineers, contractors, and clients. Results show that most projects encounter time wastages, insufficient materials, and mismanagement of resources. Numerous time and cost management strategies assist in preventing cost overrun and schedule extension in civil …
Published in Recent Trends in Civil Engineering & Technology · Vol. 12, Issue 3, 2022 · pp. 10–19 Read article
-
Planning and Scheduling of Resort Construction Using MS Project
Abstract: Construction project success largely depends on effective planning, scheduling, and resource management. This project, titled “Planning and Scheduling of Resort Construction Using MS Project,” focuses on analyzing a resort construction project that commenced in 2016 but remains incomplete as of 2025. The prolonged duration of the project indicates significant challenges in project management, scheduling, and execution. The primary objective of this study is to identify the factors responsible for delays …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 2, 2026 · pp. 21–33 Read article
-
Comparative Study of Time Slice Windows Analysis and Impacted As-Planned Analysis for Data Center Construction Projects Using Primavera P6 24.12 Version
Abstract: Data centers are IT infrastructure that needs to be precisely scheduled and coordinated. Significant financial losses and operational failures may result from building delays. Stakeholders can assign blame and comprehend the reasons behind delays with the aid of forensic delay analysis. Because of their unique approaches and legal acceptability, TSWA, and IAPA are commonly used among the many strategies. These methods provide various ways to analyze project schedules and pinpoint …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 1, 2026 · pp. 33–51 Read article
-
Innovative Risk Aperture Manipulation Model for Risk Management in Mega Project Construction
Abstract: The complexities associated with the technical, managerial and financial interventions in mega project implementation accommodates greater risks, encapsulating the complete project period from inception to closure. Consideration of risks in mega project scope is of paramount importance as it delineates either threat or opportunity in the guise of uncertainty at each and every phase of the project. The absence of innovative and rigorous risk management structure imparts a perplexing scenario …
Published in Trends in Transport Engineering and Applications · Vol. 2, Issue 1, 2015 · pp. 11–24 Read article
-
Basic Re-procurement Considerations Influencing Highway Projects in Nigeria
Abstract: Failures in road construction project procurement are attributed to the existence of many factors right from the inception. Such factors include costs, technical capabilities, qualities, sub-contractors, resources, risk events, among others. These factors have direct consequence on the funding, the estimated time of the project completion and may result in outright termination of the project. In order to meet targeted project goals, project client seeks alternative measures of reviving the …
Published in Trends in Transport Engineering and Applications · Vol. 2, Issue 3, 2015 · pp. 1–11 Read article
-
Incorporating Industrial Safety Management into Civil Engineering Works for Health and Environment
Abstract: Industrial safety management is an important tool for protecting workers, assets, and environment because it involves risk assessment, hazard control, emergency preparedness and other important practices that can enhance civil engineering construction. Civil engineering projects such as roads, bridges, dams, and water supply systems present complex occupational and environmental risks, from physical accidents on-site to ecological degradation. This paper critically examines the integration of industrial safety and management strategies into …
Published in Journal of Industrial Safety Engineering · Vol. 12, Issue 3, 2025 · pp. 25–41 Read article
-
A Step by Step Method for Carrying Out Earned Value Analysis: Case Study of a Road Project
Abstract: A framework of Earned Value Management (EVM) is proposed with the help of case study of a road project completed by Al Tamak, Abu Dhabi (UAE). The framework gives emphasis on the process part (i.e. before the actual start of project monitoring) of Earned Value Management through MS-Project. This framework will help in measuring and managing the variances in schedule and cost of the project in terms of money. The …
Published in Journal of Construction Engineering, Technology & Management · Vol. 5, Issue 3, 2015 · pp. 18–24 Read article
-
Monitoring and Forecasting in Construction Projects Using Time Buffer
Abstract: The key to project management is effective performance monitoring and forecasting. The existing methods using input- output cash flow, earned value, etc. do not differentiate between work done on the critical path and work done on non-critical paths. Such methods mask the real situation and mislead the project team because progress on one path often compensate for the delay in other. The paper proposes a more effective method to facilitate …
Published in Journal of Construction Engineering, Technology & Management · Vol. 6, Issue 2, 2016 · pp. 9–16 Read article
-
Comparative Study of Schedule Analysis Using Earned Value and Earned Schedule Methods on Two Distinct Construction Projects
Abstract: This paper focuses on how Earned Value (EV) and Earned Schedule (ES) is used for schedule analysis to monitor the progress and forecast important information in schedule; well before it is too late to make any corrective changes. Two case studies are adopted here. Using Earned Value, its monthly performance is computed along with project completion date is forecasted. The reliability of the two methods is compared using correlation analysis …
Published in Journal of Construction Engineering, Technology & Management · Vol. 5, Issue 3, 2015 · pp. 1–5 Read article
-
Standard Development for Improvement of Stakeholder Communication for Design Projects in Architecture, Engineering, and Construction Industry Deploying Clean Energy Solutions
Abstract: Projects in the architectural, engineering, and construction (AEC) industry are heavily driven by strict timelines and budgets. Typically, design engineering firms handle a large volume and wide variety of projects, thereby requiring both competent professionals and resources to deliver high-quality products and services. The industry would grow to USD 26.79 billion by 2034, which initiates the need to address current gaps, especially in communication between stakeholders and project delivery teams. …
Published in Recent Trends in Civil Engineering & Technology · Vol. 16, Issue 2, 2026 · pp. 52–60 Read article
-
Comparative Study between Smart Controls and Conventional Bottom Hole Completions
Abstract: This research project made use of Schlumberger’s “ECLIPSE 100” reservoir simulator to predict the performance of a reservoir with an overlying gas cap and an underlying aquifer (i.e., a three- phase Water-Oil-Gas reservoir) under conventional BHC techniques. Additional work was done to ascertain the suitability of incorporating an Intelligent Well (IW) to deal with water production problem by placing Inflow Control Valves (ICV) at particular segments in the well to …
Published in Journal of Petroleum Engineering & Technology · Vol. 6, Issue 3, 2016 · pp. 77–89 Read article
-
Project Performance Appraisal using PQR: A Review
Abstract: The success of a construction project can be indicated by project performance. The concept of project performance has not been clearly defined in the construction industry. Project performance appraisal is usually quantified by performance metrics. To measure performance we need to identify performance metrics. With reference to performance metrics benchmarking of project is done. In literature, while usual performance metrics such as time, cost, quality, client satisfaction etc. are considered …
Published in Journal of Construction Engineering, Technology & Management · Vol. 6, Issue 2, 2016 · pp. 25–33 Read article
-
Towards a Geo-Classification of the Niger Delta for Highway Investment Costing Applications
Abstract: The study carries out a quasi-experimentation, as a basis of devising a spatial quantitative concept, delineating distinct geologic settings which would have differing cost implications for highway infrastructure development in the Niger Delta region of Nigeria. Three broad conceptual geomorphic boundaries, for the categorisation of Niger Delta soils in engineering geologic costing application, were discerned within this conceptual lens. The study further statistically explores the synthesised geo-zonation for differences in …
Published in Trends in Transport Engineering and Applications · Vol. 7, Issue 1, 2020 · pp. 24–40 Read article
-
Time-Cost-Quality Analysis for Construction of A Small House
Abstract: The clients of the industry focus mainly on time and cost of the project, they seldom focus on quality. For them if a project is completed within time and least cost overruns then the project is success and if not then its failures. A project manager should educate the client about the project site problems keeping in mind client’s demand and expectations. He should maintain the equilibrium for getting the …
Published in Journal of Construction Engineering, Technology & Management · Vol. 6, Issue 2, 2016 · pp. 1–8 Read article
-
Application of GIS Web Based in Construction Management
Abstract: Project management is the process and task of planning, organizing, motivating, and controlling resources, procedures, and protocols to achieve specific goals in scientific or daily problems. In the construction world, it is crucial to monitor project management because each project has its duration and every contractor needs to complete the project within the given time. Moreover, exceeding the duration given will cause the penalty to the contractor which in turn …
Published in Journal of Geotechnical Engineering · Vol. 4, Issue 2, 2017 · pp. 17–25 Read article
-
A Comparative Study on Causes of Delay Incompletion of Construction Projects in Oman
Abstract: The aim of this paper was to identify the problems resulting from the delays in completion of construction projects in Oman. A field study was conducted on a number of construction projects in Muscat area to collect data required for analysis. Two groups of projects were studied, the first group included projects constructed during the period 2007–2008 and the second group studied comprisedprojects constructed during the period 2009–2010. It was …
Published in Journal of Construction Engineering, Technology & Management · Vol. 3, Issue 1, 2013 · pp. 1–6 Read article
-
Assessment of Approval Process and Government Policies: Special Approach for Combating Building Collapse in Nigeria
Abstract: Adequate synergy among clients, government agencies, structural engineers, regulatory bodies, stakeholders, and allied professionals in building industry is imperative for combating incidence of building collapse in Nigeria. This study examined the supervision responsibilities of professionals, construction management and challenges of building inspectors in selected local governments in south western Nigeria. Literatures, media, systematic sampling technique and structured interview guide were used for collection of data. Data gathered were analyzed and …
Published in Journal of Construction Engineering, Technology & Management · Vol. 11, Issue 2, 2021 · pp. 29–36 Read article
-
Risk Management in Civil Engineering by FTA, FMEA and Risk Matrix
Abstract: Infrastructure projects, particularly in civil engineering, are fraught with uncertainties that manifest as both physical and financial risks. The project report, titled Quantifying and Managing Financial and Physical Risks in Infrastructure Projects, aims to bridge the existing gap between managing these two critical categories of risks. By integrating advanced statistical methodologies such as Failure Mode and Effects Analysis (FMEA), Fault Tree Analysis (FTA), Risk Matrix, and Regression Analysis, this study …
Published in Journal of Structural Engineering and Management · Vol. 12, Issue 1, 2025 · pp. 34–46 Read article
-
Streamlining Transport Management: The Evolution of Machine-to-Machine Communication
Abstract: Every transportation industry, as is well known, has its own paperwork that employees of the organisation can complete. There is a lot of paperwork in the transport business. The user will be able to oversee multiple tasks with this way. Additionally, the user can track orders and inspect their goods. By using this method, the user will be able to work more efficiently and save time and energy. It involves …
Published in International Journal of Electrical and Communication Engineering Technology · Vol. 1, Issue 2, 2023 · pp. 21–26 Read article
-
A Review on Implementation of Lean Manufacturing in Maize Grinding Mill Assembly Line
Abstract: At present scenario, lean manufacturing has become a worldwide phenomenon. It is quite successful in drawing the attention of companies of all sizes. A large number of organizations are following the lean technologies and experiencing vast improvements in quality, production, customer service and profitability. Lean manufacturing is a systematic approach to identify and eliminate the waste through continuous improvement. The manufacturing industry in India must also look to leverage its …
Published in Journal of Industrial Safety Engineering · Vol. 3, Issue 1, 2016 · pp. 10–14 Read article