Time Overrun Causes in Public Construction Projects in Saudi Arabia: Contractors’ View
Abstract: The time schedule in construction projects is one of the prime measures for project success. However, the construction industry worldwide is full of projects that were completed with significant time overrun. This problem is critical and has negative effects on construction parties in terms of growth in adversarial relationships, mistrust, litigation, arbitration and cash flow problems. This study aims at identifying the time overrun causes in public construction projects in …
Published in Journal of Construction Engineering, Technology & Management · Vol. 3, Issue 3, 2013 · pp. 67–75 Read article
-
Significance and Analysis of the Time and Cost Overrun in the Construction Industry of Mumbai
Abstract: The occurrence of time and cost overrun has become quite significant in a majority of construction projects in India, which is negatively affecting the GDP and potential development of nation. As per the statistics of project cost and duration in March 2012, 179 projects out of 555 projects of worth 150 Crore INR have been facing cost and time overrun and others are at the very high risk, with the …
Published in Journal of Industrial Safety Engineering · Vol. 8, Issue 2, 2021 · pp. 7–13 Read article
-
Budgetary Control and Timely Completion of Civil Engineering Projects Through Financial Management
Abstract: Financial management is critical for dealing with time delays and cost overruns in civil engineering. The methodology adopted in this study is questionnaires distributed to different construction professionals and surveys from some sites. Professionals consulted include engineers, contractors, and clients. Results show that most projects encounter time wastages, insufficient materials, and mismanagement of resources. Numerous time and cost management strategies assist in preventing cost overrun and schedule extension in civil …
Published in Recent Trends in Civil Engineering & Technology · Vol. 12, Issue 3, 2022 · pp. 10–19 Read article
-
An Empirical Analysis of Cost, Time, and Quality Relationships Using Correlation and Regression Techniques
Abstract: Cost, time, and quality have been recognized as the three key dimensions that determine construction project performance and are commonly represented through the "Project Management Triangle." However, despite their theoretical linkage, there is limited empirical evidence to quantify the nature of their relationships, particularly within developing construction markets. This paper seeks to contribute to addressing this shortfall by investigating the specific influence of cost and schedule variations upon quality outcomes …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 1, 2026 · pp. 52–60 Read article
-
Analysis of Time and Cost Overruns in Road Project
Abstract: Management of the risk is the best approach during construction of road project, wherein numbers of unforeseen factors are involved. The project under consideration is the construction of 30 m wide road from Wadalagaon to Takligaon under the jurisdiction of Nashik Municipal Corporation. The road construction was started especially to cater the huge crowd likely to occur during Sinhastha Kumbha Mela, which comprises of laying of water supply, storm water …
Published in Journal of Construction Engineering, Technology & Management · Vol. 6, Issue 2, 2016 · pp. 52–57 Read article
-
Identifying Factors Leading to Cost Overrun in Construction Projects in Jordan
Abstract: The problem of cost overrun in construction industry is common worldwide and the construction industry in Jordan is no exception. The main objective of the study reported in this paper was to identify the causes of cost overrun in construction projects in Jordan. A comprehensive literature review from various sources was made to carry out the study. A questionnaire survey was conducted to find the causes of cost overrun related …
Published in Journal of Construction Engineering, Technology & Management · Vol. 5, Issue 3, 2015 · pp. 25–33 Read article
-
Delay factors in construction projects effecting cost & time
Abstract: In construction industry one of the most common problems are cost over-run and delay. Delay can be minimized with the help of optimal scheduling techniques with the help of scheduling software’s. Delay means we are not meeting the deadline on time which results cost and time overrun. For the economic development of India construction segment is one of the sectors that provides important component. It is considered one of the …
Published in Recent Trends in Civil Engineering & Technology · Vol. 8, Issue 3, 2018 · pp. 6–13 Read article
-
Evaluating Factors Effecting Building Construction Labor Productivity in Somaliland
Abstract: The construction industry has been referred to as having a multiplier effect on the performance of any economy. Poor productivity of workers is one of the most overwhelming problems faced by construction industries, especially those in developing countries, the poor productivity of labor can cause a project cost and time overrun. The pinpointing of the factors that affect labor productivity would enable the project team to effectively use the resources …
Published in Journal of Construction Engineering, Technology & Management · Vol. 11, Issue 2, 2021 · pp. 19–28 Read article
-
Dispute Preventive Measures in Construction
Abstract: Dispute is one of the critical factors causing inefficient construction industry due to which cost and time overrun occurs. Various causes of disputes whether client related or contractor related, are inherently lies in contract documents. A contract document comprises of mainly two section of documents, one, contractual terms and conditions related documents (General conditions of contract, Special conditions of contract) and second one is the technical documents (specifications, BOQ, etc.). …
Published in Journal of Construction Engineering, Technology & Management · Vol. 13, Issue 2, 2023 · pp. 7–18 Read article
-
REALIZATION OF SUSTAINABLE CIVIL INFRASTRUCTURES THROUGH EFFECTIVE PROJECT MANAGEMENT IN A CHALLENGING ECONOMY
Abstract: Infrastructure and effective project management is a great challenge facing sustainable development of infrastructure in Third World Cities and Civil Engineers have a lot of roles to play in sustainable infrastructural development in a challenging economy. This paper examines ways of realizing sustainable infrastructures through project management and civil engineering practice. Secondary data from works of literature and notable information from engineers were utilized. Project management is very essential for …
Published in Journal of Construction Engineering, Technology & Management · Vol. 12, Issue 3, 2022 · pp. 1–10 Read article
-
Risk Management in Civil Engineering by FTA, FMEA and Risk Matrix
Abstract: Infrastructure projects, particularly in civil engineering, are fraught with uncertainties that manifest as both physical and financial risks. The project report, titled Quantifying and Managing Financial and Physical Risks in Infrastructure Projects, aims to bridge the existing gap between managing these two critical categories of risks. By integrating advanced statistical methodologies such as Failure Mode and Effects Analysis (FMEA), Fault Tree Analysis (FTA), Risk Matrix, and Regression Analysis, this study …
Published in Journal of Structural Engineering and Management · Vol. 12, Issue 1, 2025 · pp. 34–46 Read article
-
Assessment of Risk Management in Nigeria Construction Industry
Abstract: AbstractIneffective risk management in the construction industry over the years has caused significant negative effects such as cost overrun, delay in completion time, low quality of end product, re-construction of work and project abandonment. The study was designed to assess risk management in Nigeria construction industry with a view to identifying and assess risk management tools used in the construction industry, know the level of usage of risk management tools …
Published in Journal of Construction Engineering, Technology & Management · Vol. 8, Issue 2, 2018 · pp. 1–10 Read article
-
Time-Cost-Quality Analysis for Construction of A Small House
Abstract: The clients of the industry focus mainly on time and cost of the project, they seldom focus on quality. For them if a project is completed within time and least cost overruns then the project is success and if not then its failures. A project manager should educate the client about the project site problems keeping in mind client’s demand and expectations. He should maintain the equilibrium for getting the …
Published in Journal of Construction Engineering, Technology & Management · Vol. 6, Issue 2, 2016 · pp. 1–8 Read article
-
Study of Cost Overrun in Repair & Rehabilitation Projects in India
Abstract: In broad sense, the word "rehabilitation" suggested putting a building back to how it was before. The specialized area of repair and rehabilitation engineering necessitates knowledge and skills that go beyond those needed for design and construction engineering. Repair and rehabilitation projects are significantly more challenging and more complicated than new construction projects. It is vital to take a methodical approach to structural deterioration, and technology management and economics should …
Published in International Journal of Architectural Design and Planning Read article
-
Execution of a Large Engineering Project in an R&D Institution- Some Experiences
Abstract: Steam Generator Test Facility (SGTF) was set up mainly to validate the design of the steam generator of the Prototype Fast Breeder Reactor (PFBR). PFBR is a power reactor of 500 MWe after the successful Fast Breeder Test Reactor (FBTR). FBTR was built in collaboration with French Atomic Energy Commission (CEA). It was similar to the 40 MWt Rapsodie reactor but had SG modules of the Phenix reactor design in …
Published in Journal of Nuclear Engineering & Technology · Vol. 12, Issue 3, 2022 · pp. 27–35 Read article
-
Evaluating Delay Impacts: From Root Cause Analysis to Dispute Resolution
Abstract: Construction projects inherently involve complex coordination among multiple stakeholders, interdependent tasks, and unpredictable external challenges, which frequently cause schedule overruns and disputes. Traditional contractual mechanisms—such as extensions of time (EoT), liquidated damages, and force majeure clauses—serve to define responsibilities, allocate risk, and establish formal dispute pathways when delays arise. For example, EoT provisions protect contractors from penalties when delays are beyond their control, provided proper notice and evidence are submitted …
Published in Journal of Structural Engineering and Management · Vol. 12, Issue 3, 2025 · pp. 11–25 Read article
-
Adoption of Managerial Skills for Strengthening Civil Engineering Construction and Infrastructural Development in Nigeria
Abstract: Managerial economy is vital for environmental and national development. Infrastructure development is that the basis of measuring the performance of democratic leaders and the inspiration of excellent democratic governance. This paper examined infrastructural development in Nigeria with in view of incorporating managerial skills for optimal performance. Challenges and way forward were checked for effective and efficient delivery of projects. Government has the facility to place in situ all measures that …
Published in Journal of Construction Engineering, Technology & Management · Vol. 10, Issue 3, 2020 · pp. 14–20 Read article
-
Analysis of Cost and Schedule Performance of Residential Building Projects by EVM Technique
Abstract: Earned value management (EVM) is a project control technique which provides a quantitative measure of work performance by cost and schedule monitoring. It involves a crediting (earning) of budget as scheduled work is performed. The EVM technique is a proven method to evaluate work progress in order to identify schedule slippage and areas of budget overruns. Value earned for a given task is computed as budgeted cost of work performed …
Published in Journal of Construction Engineering, Technology & Management · Vol. 4, Issue 1, 2014 · pp. 1–7 Read article
-
Communication Pathways and Project Success: Analyzing Stakeholder Coordination Impacts on Construction Outcomes
Abstract: It is very critical to have effective communication and coordination among stakeholders for the successful delivery of the projects. Effective communication keeps stakeholders well-informed about project progress, promoting transparency, trust, and collaboration. Coordination ensures that responsibilities and resources are efficiently allocated, reducing the risk of misunderstandings and enhancing decision-making processes. Inadequate stakeholder engagement can lead to confusion, delays, rework, and the failure to meet key project milestones. The impact of …
Published in Journal of Construction Engineering, Technology & Management · Vol. 15, Issue 3, 2025 · pp. 104–126 Read article
-
Digital Transformation of Urban Infrastructure with the Help of AI Guardians
Abstract: The construction industry continues to face challenges related to quality control, safety protocols, and meeting project deadlines. These issues often result in significant cost overruns and project delays. Traditional inspection and site management approaches rely heavily on manual work and individual judgment. As a result, human errors can easily occur, and these methods provide only limited snapshots of site conditions over time. This paper presents a comprehensive framework that uses …
Published in Recent Trends in Civil Engineering & Technology · Vol. 16, Issue 1, 2026 · pp. 16–25 Read article