Project Abandonment and Delay in Niger Delta’s Highway Projects
Abstract: The pervasiveness of project delays and abandonment in the developing world is evident in the literature. The study outlines the prevalence of extreme project delays and abandonment in the Niger Delta region, an archetypical low-lying wetland in Nigeria, given the peculiar wet land geology of the Niger Delta. A survey of the empirical literature evidence suggests more profound technical shortcomings and procurement issues, beyond the generality of factors endemic in …
Published in Trends in Transport Engineering and Applications · Vol. 8, Issue 3, 2021 · pp. 19–32 Read article
-
Stakeholder’s Perception of the Causes and Effects of Construction Delays on Project Delivery: A Review
Abstract: Indian construction industry is large, volatile, and requires tremendous capital outlays. Typically, the work offers low rates of return in relation to the amount of risk involved. A unique element of risk in the industry is the manner in which disputes and claims are woven through the fiber of the construction process. Delay is generally acknowledged as the most common, costly, complex and risky problem encountered in construction projects. Because …
Published in Journal of Construction Engineering, Technology & Management · Vol. 4, Issue 2, 2014 · pp. 22–29 Read article
-
An Investigation into delay factors in building construction projects; Case of Hargeisa, Somaliland
Abstract: Since the construction industry contributes to the development and growth of the country’s economy, it is indicated as one of the crucial sectors. However, this industry frequently faces delay problems, which have an impact on the progress of industry-related projects and their performance. Identifying the reasons for the delay in building construction projects can save money also time. It also improves the project’s performance and ensures its successful completion. Therefore, …
Published in Journal of Construction Engineering, Technology & Management · Vol. 12, Issue 2, 2022 · pp. 30–41 Read article
-
A Comparative Study on Causes of Delay Incompletion of Construction Projects in Oman
Abstract: The aim of this paper was to identify the problems resulting from the delays in completion of construction projects in Oman. A field study was conducted on a number of construction projects in Muscat area to collect data required for analysis. Two groups of projects were studied, the first group included projects constructed during the period 2007–2008 and the second group studied comprisedprojects constructed during the period 2009–2010. It was …
Published in Journal of Construction Engineering, Technology & Management · Vol. 3, Issue 1, 2013 · pp. 1–6 Read article
-
Delay factors in construction projects effecting cost & time
Abstract: In construction industry one of the most common problems are cost over-run and delay. Delay can be minimized with the help of optimal scheduling techniques with the help of scheduling software’s. Delay means we are not meeting the deadline on time which results cost and time overrun. For the economic development of India construction segment is one of the sectors that provides important component. It is considered one of the …
Published in Recent Trends in Civil Engineering & Technology · Vol. 8, Issue 3, 2018 · pp. 6–13 Read article
-
Digital Transformation of Urban Infrastructure with the Help of AI Guardians
Abstract: The construction industry continues to face challenges related to quality control, safety protocols, and meeting project deadlines. These issues often result in significant cost overruns and project delays. Traditional inspection and site management approaches rely heavily on manual work and individual judgment. As a result, human errors can easily occur, and these methods provide only limited snapshots of site conditions over time. This paper presents a comprehensive framework that uses …
Published in Recent Trends in Civil Engineering & Technology · Vol. 16, Issue 1, 2026 · pp. 16–25 Read article
-
Comparative Study of Time Slice Windows Analysis and Impacted As-Planned Analysis for Data Center Construction Projects Using Primavera P6 24.12 Version
Abstract: Data centers are IT infrastructure that needs to be precisely scheduled and coordinated. Significant financial losses and operational failures may result from building delays. Stakeholders can assign blame and comprehend the reasons behind delays with the aid of forensic delay analysis. Because of their unique approaches and legal acceptability, TSWA, and IAPA are commonly used among the many strategies. These methods provide various ways to analyze project schedules and pinpoint …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 1, 2026 · pp. 33–51 Read article
-
Planning and Scheduling of Resort Construction Using MS Project
Abstract: Construction project success largely depends on effective planning, scheduling, and resource management. This project, titled “Planning and Scheduling of Resort Construction Using MS Project,” focuses on analyzing a resort construction project that commenced in 2016 but remains incomplete as of 2025. The prolonged duration of the project indicates significant challenges in project management, scheduling, and execution. The primary objective of this study is to identify the factors responsible for delays …
Published in Journal of Construction Engineering, Technology & Management · Vol. 16, Issue 2, 2026 · pp. 21–33 Read article
-
Analysis of Time and Cost Overruns in Road Project
Abstract: Management of the risk is the best approach during construction of road project, wherein numbers of unforeseen factors are involved. The project under consideration is the construction of 30 m wide road from Wadalagaon to Takligaon under the jurisdiction of Nashik Municipal Corporation. The road construction was started especially to cater the huge crowd likely to occur during Sinhastha Kumbha Mela, which comprises of laying of water supply, storm water …
Published in Journal of Construction Engineering, Technology & Management · Vol. 6, Issue 2, 2016 · pp. 52–57 Read article
-
Early Autism Diagnosis: Machine Learning Models and Their Effectiveness
Abstract: Diagnosis is of utmost importance for timely intervention and support. However, traditional diagnosis methods, which are based on subjective assessment, are delayed. This project explores the role that machine learning techniques might play in enhancing the accuracy and effectiveness of ASD detection. Several state-of-the-art classification algorithms were benchmarked using a dataset from Kaggle. Logistic Regression, XG Boost, Random Forest, Decision Tree, and Gradient Boosting were taken into consideration. Other performance …
Published in Journal of Instrumentation Technology & Innovations · Vol. 14, Issue 2, 2024 Read article
-
IoT-Based Emergency SOS System for Post-Accident Assistance
Abstract: The increase in road accidents poses significant challenges for timely medical response, often leading to life-threatening delays. This project proposes an IoT-based accident wound detection system that utilizes a night vision camera mounted on either the interior or exterior of a vehicle. The system aims to detect injuries sustained by individuals during a collision and promptly alert emergency services. By employing a night vision camera, the system can operate effectively …
Published in Journal of Microelectronics and Solid State Devices · Vol. 12, Issue 2, 2025 · pp. 11–19 Read article
-
A Study of Factor Affecting of Delayness of Cost Overrun in Building Construction
Abstract: AbstractIn this paper, a study has been summarized about the factor that cause of delay in construction housing project in the Gwalior division and produce the statistical result. The result of the investigation will be the guideline to the parties that involve, so that it will avoid any reason of the delay that will happen in their project.Keywords: development, building, construction
Published in Journal of Construction Engineering, Technology & Management · Vol. 8, Issue 2, 2018 · pp. 11–13 Read article
-
Lean Design Management as a Solution for Delays in Design Phase
Abstract: The results of this study reveal that traditional project management has a negative impact on the performance of construction projects and addresses its weaknesses in the design stage. Poor quality documentation from poorly managed design projects leads to budget overspending, delay, rework, and disputes. This paper emphasizes the importance of technical cooperation and highlights the lack of focus on value and waste in design development. Lean Design Management (LDM) is …
Published in International Journal of Architectural Design and Planning · Vol. 2, Issue 1, 2024 · pp. 30–39 Read article
-
Decision–making Model for Road Projects Retendering in Nigeria
Abstract: The failure in securing basic information about project can rock mega investment in road construction. Most road construction projects suffered due to reasons attributed to delays or terminations which prompt project owners to consider retendering option. Effective and efficient decision-making is prerequisite in the retendering of projects and is perceived lacking in most road projects. In order to overcome these challenges confronting road construction project, this paper aims to build …
Published in Trends in Transport Engineering and Applications · Vol. 2, Issue 3, 2015 · pp. 19–29 Read article
-
Different Compressor Adders
Abstract: AbstractMultipliers are one of the main blocks which decide the circuit performance as well as computation speed. In multiplication, addition of partial products contributes most to the circuit delay, power, and area. In this project, compressor adders are used to reduce this delay. Hence, compressors are a major part of the multiplier circuit that decides the overall speed of the system. For high-speed processing and higher systems, a huge number …
Published in Journal of Semiconductor Devices and Circuits · Vol. 5, Issue 2, 2018 · pp. 19–26 Read article
-
Evaluating Delay Impacts: From Root Cause Analysis to Dispute Resolution
Abstract: Construction projects inherently involve complex coordination among multiple stakeholders, interdependent tasks, and unpredictable external challenges, which frequently cause schedule overruns and disputes. Traditional contractual mechanisms—such as extensions of time (EoT), liquidated damages, and force majeure clauses—serve to define responsibilities, allocate risk, and establish formal dispute pathways when delays arise. For example, EoT provisions protect contractors from penalties when delays are beyond their control, provided proper notice and evidence are submitted …
Published in Journal of Structural Engineering and Management · Vol. 12, Issue 3, 2025 · pp. 11–25 Read article
-
Analysis of Project Management Optimization Using CPM and PERT in a Dynamic Business Environment
Abstract: In the current fast-changing business environment, organizations must remain agile and strategically responsive to unpredictable challenges such as supply chain disruptions, shifting consumer demands, and evolving market trends. Project management techniques like the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT) serve as valuable tools in helping businesses manage these complexities effectively. CPM is a time-focused method that identifies the longest sequence of dependent tasks in …
Published in Journal of Construction Engineering, Technology & Management · Vol. 15, Issue 3, 2025 Read article
-
A Monte Carlo Simulation Approach to Decision Analytics in Manufacturing and Industrial Automation Project Management
Abstract: Manufacturing and industrial automation projects face high uncertainty and risk arising from factors such as complex supply chains, equipment variability, and fluctuating production demands. If not properly managed, these uncertainties can lead to costly delays, unplanned downtime, and budget overruns that jeopardize project success. Given the shortcomings of deterministic planning in such volatile environments. If not properly managed, it can lead to costly delays and failures if not properly managed. …
Published in Journal of Production Research & Management · Vol. 15, Issue 2, 2025 · pp. 1–12 Read article
-
Cross-Domain Comparative Analysis of Microwave Imaging Systems for Medical Diagnostics and Industrial Testing
Abstract: Microwave imaging is gaining significant traction as a non-ionizing, low-cost, and portable alternative to conventional diagnostic and inspection modalities in both medical and industrial domains. Leveraging the dielectric contrast between healthy and anomalous tissues or materials, microwave imaging systems enable early-stage detection and characterization of pathological or structural anomalies. This review provides a detailed comparative analysis of microwave imaging systems tailored for three critical applications: breast cancer detection, brain stroke …
Published in Journal of Microwave Engineering and Technologies · Vol. 12, Issue 2, 2025 · pp. 39–48 Read article
-
Budgetary Control and Timely Completion of Civil Engineering Projects Through Financial Management
Abstract: Financial management is critical for dealing with time delays and cost overruns in civil engineering. The methodology adopted in this study is questionnaires distributed to different construction professionals and surveys from some sites. Professionals consulted include engineers, contractors, and clients. Results show that most projects encounter time wastages, insufficient materials, and mismanagement of resources. Numerous time and cost management strategies assist in preventing cost overrun and schedule extension in civil …
Published in Recent Trends in Civil Engineering & Technology · Vol. 12, Issue 3, 2022 · pp. 10–19 Read article