33 articles for “Cost Overruns”
-
Risk Management in Civil Engineering by FTA, FMEA and Risk Matrix
Abstract: Infrastructure projects, particularly in civil engineering, are fraught with uncertainties that manifest as both physical and financial risks. The project report, titled Quantifying and Managing Financial and Physical Risks in Infrastructure Projects, aims to bridge the existing gap between managing these two critical categories of risks. By integrating advanced statistical methodologies such as Failure Mode and Effects Analysis (FMEA), Fault Tree Analysis (FTA), Risk Matrix, and Regression Analysis, this study …
Published in Journal of Structural Engineering and Management · Vol. 12, Issue 1, 2025 · pp. 34–46 Read article
-
Assessment of Risk Management in Nigeria Construction Industry
Abstract: AbstractIneffective risk management in the construction industry over the years has caused significant negative effects such as cost overrun, delay in completion time, low quality of end product, re-construction of work and project abandonment. The study was designed to assess risk management in Nigeria construction industry with a view to identifying and assess risk management tools used in the construction industry, know the level of usage of risk management tools …
Published in Journal of Construction Engineering, Technology & Management · Vol. 8, Issue 2, 2018 · pp. 1–10 Read article
-
REALIZATION OF SUSTAINABLE CIVIL INFRASTRUCTURES THROUGH EFFECTIVE PROJECT MANAGEMENT IN A CHALLENGING ECONOMY
Abstract: Infrastructure and effective project management is a great challenge facing sustainable development of infrastructure in Third World Cities and Civil Engineers have a lot of roles to play in sustainable infrastructural development in a challenging economy. This paper examines ways of realizing sustainable infrastructures through project management and civil engineering practice. Secondary data from works of literature and notable information from engineers were utilized. Project management is very essential for …
Published in Journal of Construction Engineering, Technology & Management · Vol. 12, Issue 3, 2022 · pp. 1–10 Read article
-
Time-Cost-Quality Analysis for Construction of A Small House
Abstract: The clients of the industry focus mainly on time and cost of the project, they seldom focus on quality. For them if a project is completed within time and least cost overruns then the project is success and if not then its failures. A project manager should educate the client about the project site problems keeping in mind client’s demand and expectations. He should maintain the equilibrium for getting the …
Published in Journal of Construction Engineering, Technology & Management · Vol. 6, Issue 2, 2016 · pp. 1–8 Read article
-
Digital Transformation of Urban Infrastructure with the Help of AI Guardians
Abstract: The construction industry continues to face challenges related to quality control, safety protocols, and meeting project deadlines. These issues often result in significant cost overruns and project delays. Traditional inspection and site management approaches rely heavily on manual work and individual judgment. As a result, human errors can easily occur, and these methods provide only limited snapshots of site conditions over time. This paper presents a comprehensive framework that uses …
Published in Recent Trends in Civil Engineering & Technology · Vol. 16, Issue 1, 2026 · pp. 16–25 Read article
-
Stakeholder’s Influence on Design-Construction Planning
Abstract: The design phase requires several interactions between the client and the architect as compared to other phases. Major decisions on the project were finalized during this design phase with the inadequate involvement of the forthcoming stakeholders—fabricators, contractors and vendors. Further, fragmentation in design and construction phase had led to redesign and rework during the construction execution. Additionally, this fragmentation had design solutions that had not involved constructability issues, which resulted …
Published in Journal of Construction Engineering, Technology & Management · Vol. 6, Issue 2, 2016 · pp. 34–41 Read article
-
Execution of a Large Engineering Project in an R&D Institution- Some Experiences
Abstract: Steam Generator Test Facility (SGTF) was set up mainly to validate the design of the steam generator of the Prototype Fast Breeder Reactor (PFBR). PFBR is a power reactor of 500 MWe after the successful Fast Breeder Test Reactor (FBTR). FBTR was built in collaboration with French Atomic Energy Commission (CEA). It was similar to the 40 MWt Rapsodie reactor but had SG modules of the Phenix reactor design in …
Published in Journal of Nuclear Engineering & Technology · Vol. 12, Issue 3, 2022 · pp. 27–35 Read article
-
Delay factors in construction projects effecting cost & time
Abstract: In construction industry one of the most common problems are cost over-run and delay. Delay can be minimized with the help of optimal scheduling techniques with the help of scheduling software’s. Delay means we are not meeting the deadline on time which results cost and time overrun. For the economic development of India construction segment is one of the sectors that provides important component. It is considered one of the …
Published in Recent Trends in Civil Engineering & Technology · Vol. 8, Issue 3, 2018 · pp. 6–13 Read article
-
Evaluating Factors Effecting Building Construction Labor Productivity in Somaliland
Abstract: The construction industry has been referred to as having a multiplier effect on the performance of any economy. Poor productivity of workers is one of the most overwhelming problems faced by construction industries, especially those in developing countries, the poor productivity of labor can cause a project cost and time overrun. The pinpointing of the factors that affect labor productivity would enable the project team to effectively use the resources …
Published in Journal of Construction Engineering, Technology & Management · Vol. 11, Issue 2, 2021 · pp. 19–28 Read article
-
Dispute Preventive Measures in Construction
Abstract: Dispute is one of the critical factors causing inefficient construction industry due to which cost and time overrun occurs. Various causes of disputes whether client related or contractor related, are inherently lies in contract documents. A contract document comprises of mainly two section of documents, one, contractual terms and conditions related documents (General conditions of contract, Special conditions of contract) and second one is the technical documents (specifications, BOQ, etc.). …
Published in Journal of Construction Engineering, Technology & Management · Vol. 13, Issue 2, 2023 · pp. 7–18 Read article
-
A Monte Carlo Simulation Approach to Decision Analytics in Manufacturing and Industrial Automation Project Management
Abstract: Manufacturing and industrial automation projects face high uncertainty and risk arising from factors such as complex supply chains, equipment variability, and fluctuating production demands. If not properly managed, these uncertainties can lead to costly delays, unplanned downtime, and budget overruns that jeopardize project success. Given the shortcomings of deterministic planning in such volatile environments. If not properly managed, it can lead to costly delays and failures if not properly managed. …
Published in Journal of Production Research & Management · Vol. 15, Issue 2, 2025 · pp. 1–12 Read article
-
Analysis of Cost and Schedule Performance of Residential Building Projects by EVM Technique
Abstract: Earned value management (EVM) is a project control technique which provides a quantitative measure of work performance by cost and schedule monitoring. It involves a crediting (earning) of budget as scheduled work is performed. The EVM technique is a proven method to evaluate work progress in order to identify schedule slippage and areas of budget overruns. Value earned for a given task is computed as budgeted cost of work performed …
Published in Journal of Construction Engineering, Technology & Management · Vol. 4, Issue 1, 2014 · pp. 1–7 Read article
-
Communication Pathways and Project Success: Analyzing Stakeholder Coordination Impacts on Construction Outcomes
Abstract: It is very critical to have effective communication and coordination among stakeholders for the successful delivery of the projects. Effective communication keeps stakeholders well-informed about project progress, promoting transparency, trust, and collaboration. Coordination ensures that responsibilities and resources are efficiently allocated, reducing the risk of misunderstandings and enhancing decision-making processes. Inadequate stakeholder engagement can lead to confusion, delays, rework, and the failure to meet key project milestones. The impact of …
Published in Journal of Construction Engineering, Technology & Management · Vol. 15, Issue 3, 2025 · pp. 104–126 Read article