Journal of Electronic Design Technology

Delay Analysis for VLSI Interconnect’s Circuits

  1. Herman Al Ayubi ✉
  2. Navaid Z Rizvi

Abstract

This research work has been comprised of three parts. The first part deals with the implementation and estimation for the delay of an inverter and study of the influence of the delay variations with the increased size of the inverter. In this modern era of VLSI integrated circuits, interconnect’s delay majorly influences the device delay. The second phase of the work emphasizes on the realization of the interconnect delay and interprets the change in interconnect delay with the change in the length of the interconnect. It has been observed that the interconnect delay varies quadratically with respect to its length. This causes the interconnect delay to become non-acceptable to be used as global interconnects, as they are quite large in length. The delay can further be reduced (linearized) by inserting inverters or buffer circuit in between the interconnectnet work. The next part is, to realize delay for the interconnect having buffer circuit. This, results in achieving the optimized segment length of the interconnect with minimum delay. Keywords: INVX4, INVX8, INVX16, INVX32, PTM

References (9)

  1. Davis Jeffrey A, Meindl James D. Compact Distributed RLC Interconnect Models-Part I: Single Line Transient, Time Delay, and Overshoot Expressions . IEEE Trans Electron Devices. Nov 2000; 47(11).
  2. Sakuri T. Closed-form Expressions or Interconnect Delay, Coupling and Crosstalk in VLSI . IEEE Trans Electron Devices. Jan 1993; 40: 118–124p.
  3. Pable Sachin D, Mohd. Hasan . Interconnect Design for Subthreshold Circuits. IEEE Trans Nanotechnol. May 2012; 11(3): 633–639p.
  4. Zhihao Lin, Spanos Costas J, Milor Linda S, et al. Circuit Sensitivity to Interconnect Variation. IEEE Trans Semiconduct Manufact. Nov 1998; 11(4): 557–568p.
  5. Yizhen Tian, Feifei He, Qi -Jun Zhang, et al. Rapid ULSI In terconnect Reliability Analysis Using Neural Networks . IEEE Trans Device Mat Rel . Mar 2014; 14(1): 400–407p.
  6. Kil J, Gu J, Kim CH. A High -speed Variation-tolerant Interconnect Technique for Subthreshold Circuits using Capacitive Boosting. IEEE Trans VLSI Syst. Apr 2008; 16(4): 456–465p.
  7. Predictive Technology Model, [Online]. Available: http://www.eas.asu.edu/ptm/
  8. Pable SD, Hasan M. Ultra Low Power Signalling Challenges for Subthreshold Global Interconnects . Integration, the VLSI J ournal. Mar 2012; 45(2): 186– 196p.
  9. Lee K. On-Chip Interconnects–Giga Hertz and Beyond . I n Proc. Int. Interconnect Technology Conference. 1998; 15–17p.

Read more of it

Subscribe to one journal or build your own list of several. One invoice, one payment, access for a full year.

Subscribe to journals →

Publish your article

Peer-reviewed journals across every subject, with open access options. Send your manuscript to the right editor today.

Publish with us → Calculate your APC
Support