Lean principles have already been successfully implemented in reducing wastage in manufacturing industries such as automobile industry. The present work focuses on application of lean principles at micro level in a quality control lab of a highway project in order to increase the productivity and decrease the proportion of non-value adding time. The total time was broadly categorized into five different categories namely, moving time, waiting time, setup time, process time and reworking time. The total time reduction for a given set of experiments was found to be significant. It was observed that mainly three factors were responsible for the time wastage and decreased productivity: a. technical knowhow of the workers, b. experience of the workers with the setup and the working environment, and c. management of resources required for the experiments. Further, value added ratio was reformulated based on the observations made on site. The article also presents the proposed definitions and formulae. Recommendations are provided at the end in order to increase the productivity and value added ratio in a similar setup. Keywords: Construction, lean, management, productivity, value added ratio

References (16)

  1. Yadav Maitreya, Patil Shailendra, Tiwari Punit, et al. Implementation and Scaling up of Lean Construction Practices at AFCONS, Indian Lean Construction Conference, Mumbai, India, 2015.
  2. Ballard G, Howell G. Implementing Lean Construction: Improving Downstream Performance, Lean Construction, Balkema, Rotterdam, Netherlands, 1997, 111–125p.
  3. Ade Manoj, Deshpande VS. Lean Manufacturing and Productivity Improvement in Coal Mining Industry, Int J Eng Res Develop. 2012; 2(10): 35–43p.
  4. Ram Prasad VS, Shrivastava Sandeep. Enhancement of Productivity of Labors in a Quality Control Lab of a Highway Project through Lean Principles: A Case Study Involving Learning Curve Application, NICMAR J Constr Manage . 2015; 30(1): 81–88p.
  5. Patil S , et al. Analysis of Wastes in Construction Industry with Lean Thinking, Int J Eng Res Technol . November 2013; 2(11): e-ISSN: 2278-0181.
  6. Ketkamon Kanyakorn and Teeravaraprug Jirarat. Value and Non -value Added Analysis of Incoming Order Process, Proceedings of the International Multi Conference of Engineers and Computer Scientists. 2009, II: Hong Kong.
  7. Liker Jeffery K. The Toyota Way, Mc Graw Hill, USA, 2004.
  8. Kilpatrick Jerry, Lean Principles , Utah Manufacturing Extension Partnership, 2003.
  9. Alwi Sugiharto, et al. Non-value Adding Activities: A Comparative Study of Indonesian and Australian Construction Projects. In proceedings 10 th of the International Group of Lean Construction Conference, 2002, 627 –638p, Gramado, Brazil. Available from: https://eprints.qut.edu.au/secure/00004162/ 01/IGLC-10.doc
  10. Forbes Lincoln H, Ahmed Syed M. Modern Construction- Lean Project Delivery and Integrated Practices , CRC Press , Taylor and Francis Group, LLC , Boca Raton, 2011. Journal of Construction Engineering, Technology and Management Volume 6, Issue 1 ISSN: 2249-4723(online), ISSN: 2347-7253(print) JoCETM (2016) 61-69 © STM Journals 2016. All Rights Reserved Page 69
  11. Harsha N, et al. Implementation of Lean Concepts in the Construction Engineering Project, Int J Eng ResTechnol . May 2013; 2(5): ISSN: 2278-0181.
  12. Koskela Lauri. Application of the New Production Philosophy to Construction, CIFE Technical Report, Stanford University, September 1992.
  13. Huovila Pekka, Koskela Lauri. Contribution of Principles of Lean Construction to Meet the Challenges of Sustainable Development, Proceedings IGLC’98, 1998.
  14. CIRIA RP978, Implementing Lean in Construction: An Ove rview of CIRIA’s Guides and a Brief Introduction to Lean , London, 2013, Available from: www.ciria.org
  15. Dulaimi Mohammed Fadhil, Tanamas Caroline, The Principles and Applications of Lean Construction in Singapore, Conference on 9th International Group for Lean Construction , Singapore, China, 2001. Available from: http://eprints.uwe.ac.uk/9584
  16. Hemanand K, et al. Improving Productivity of Manufacturing Division using Lean Concepts and Development of Material Gravity Feeder A Case Study . Int J Lean Thinking. 2012; 3(2): 117–134p. Cite this Article Sandeep Shrivastava, Ram Prasad V .S. Reformulating Value Added Ratio Using a Construction Job Site Case Study. Journal of Construction Engineering, Technology & Management. 2016; 6(1): 61–69p.

Read more of it

Subscribe to one journal or build your own list of several. One invoice, one payment, access for a full year.

Subscribe to journals →

Publish your article

Peer-reviewed journals across every subject, with open access options. Send your manuscript to the right editor today.

Publish with us → Calculate your APC
Support