    Cost Optimisation-A Case Study of Infrastructure Project

    Abstract: The Double Deck component between Automotive Square and Gaddigodam comprised of main spine segment and two wing segments on either sides of spines. Both these spine and wing segment were pre-cast at casting yard and erected at site using double deck launching girder and wing erector system respectively. Further to integrate these components, stitch concrete is provided from bottom of wings using Manlift which required shuttering to be undertaken requiring …

    Published in Trends in Transport Engineering and Applications · Vol. 8, Issue 2, 2021 · pp. 47–58 Read article