Pile deviation
1 article · search the full text for this term
-
Estimation of Pile Deviation at Slope Using Finite Element Method
Abstract: This paper presents results and discussion of the pile deviation, which occurred during slope construction at the Depot LRT Kampung Kuala Sungai Baru (KKSB) Ampang Line Extension Project. The piles at RW5 slope area deviated for almost 1 m from its original location which caused tremendous cost impact to mitigate and was time consuming. An investigation was carried out by referring to the Geotechnical Assessment Report and the simulation work …
Published in Journal of Geotechnical Engineering · Vol. 3, Issue 3, 2016 · pp. 7–15 Read article