construction sequence
1 article · search the full text for this term
-
Lumped Construction Sequence for Column Shortening Analysis in High Rise Building with Outrigger System
Abstract: The exact value of column shortening is not a straightforward task. Various parameters are affected on column shortening results like rate of construction sequence and reinforcement ratio. The building should stand with high stiffness and must be able to resist lateral deformation without having discomfort to the user. The excessive drift is controlled by using outrigger system. In high rise buildings, the construction sequence analysis and conventional sequence analysis are …
Published in Recent Trends in Civil Engineering & Technology Read article