Recent Trends in Civil Engineering & Technology
Impact of Change Orders on Construction Project Performance
Abstract
The success of any construction project depends on its timely completion, according to the specifications and within the budget. Change orders during the execution of the project are inevitable. Effective management of change orders is a key for the success of the project. In the present study, an attempt has been made to analyze the impact of change orders on construction projects performance. A questionnaire was designed to obtain the views of stakeholders of construction projects and subsequently, analysis is done to draw the conclusions.Keywords: Construction Project, Effective Management, Change OrderReferences (16)
- Acharya NK, LeeYD , Im HM. Design Errors: Tragic for the Clients, Journal of Construction Research. 2006; 7(½). 177– 190p.
- Al-Hakim L. Identification of Waste Zones Associated with Supply Chain Integration, SAPICS 27th Annual Conference and Exhibition , ISNB 1 -920- 01713-5, 2005. 1–13p.
- Al-Hakim L . Waste Identification: A Supply Chain Strategy Perspective, International Conference on Business and Information, Hong Kong. 2005b.
- Arain FM, Pheng LS. The potential effects of variation orders on institutional building projects, Facilities. 2005; 23(11/12): 496–510p.
- Arain FM , Pheng LS. How Design Consultants Perceive Causes of Variation Orders for Institutional Buildings in Singapore, Architectural Engineering and Design Management . 2005b; 1(3): 181– 196p.
- Arain FM, Pheng LS. Developers views of potential causes of variation orders for institutional buildings in Singapore , Architectural Science Review. 2006; 49(1): 59–74p.
- Hanna ASPE, Calmic R, Peterson PA, et al. Quantitative Definition of Projects Impacted by Change Orders, Journal of Construction Engin eering and Management. 2002; 128(1):57–64p.
- Harbans SKS. Valuation of Varied Work: A Commentary, In: Bulletin Ingénieur, The Board of Engineers Malaysia . 2003; 20(3): 32–42p.
- Ireland L. Project Complexity: A Brief Exposure to Difficult Situations, Retrieved on October 17, 2007, from http://www.asapm.org/asapmag/articles/Pr ezSez10-07.pdf JBCC see The Joint Building Contracts Committee. 2007.
- Kelly J , Male S. Value Management in Kelly, J, Morledge, R & Wilkinson, S, ed. 'Best Value in Construction', RICS Foundation, Oxford: Blackwell Publishing Kelly, J. & Duerk, D. 2002, ' Construction Project Briefing/Architectural Programming' in Kelly, J, Morledge, R & Wilkinson, S, ed 'Bes t Value in Construction', RICS Foundation, Oxford: Blackwell Publishing. 2002.
- Koushki PA, Al -Rashid K , Kartam N. Delays and Cost Increases in the Construction of Private Residential Projects in Kuwait, Construction Management and Economics . 2005; 23: 285–294p.
- Oladapo AAA . Quantitative Assessment of the Cost and Time Impact of Variation Orders on Construction Projects, Journal of Engineering, Design and Technology . 2007; 5(1): 35–48P.
- Segawa JK, Mfolwe KM, Makuke B, et al. Construction Variations: A Scourge or a Necessity, Proceedings of the First International Conference of CIB W107 , 11-13 Nov. 2002, Cape Town, South Africa, 87–96p.
- Wainwright WH, Wood A A B. Variation and Final Account Procedure, 4th. ed. London: Hutchinson. 1983.
- Walliman N. Your Research Project ', 2nd ed., London: Sage Publications Arain, F.M. 2005a, 'Strategic Management of Variation Orders for Institutional Building: Leveraging on Information Technology', PMI Global Congress proceedings. 2005: 1–17p.
- Willis AJ , Willis CJ. Practice and Procedure of the Quantity Surveyor, 8th. ed. London: Granada. 1980. Cite this Article Shrivastav Sudhir, Kansal R., Impact of Change Orders on Construction Project Performance, Recent Trends in Civil Engineering & Technology . 2015; 5(3): 9–14p.