Journal of Production Research & Management

Scheduling of PCB Assembly Using Particle Swarm Optimization Algorithm

  1. VIJAY PANDEY ✉
  2. Mayank Pawar

Abstract

This paper deals with the problem of scheduling ‘N’ printed circuit boards (PCBs) on a single machine equipped with an automatic component interchange mechanism. The total number of different components required to process all ‘N’ PCBs is greater than the capacity of the spool. If the essential components are not on the spool, then one or more component switches must take place earlier than the PCB can be processed. The problem consists of deciding the order to schedule the PCBs on the axial insertion machine and the component to place on the spool prior to each PCB is processed. The performance- decisive factor is to minimize the total number of component switches. To overcome the problem, a particle swarm optimization (PSO) algorithm is used for optimizing the schedule of PCBs on the machine. Average industrial data are used for testing the developed algorithm for the problem.

Keywords

References (18)

  1. Geiger C. D., Kempf K. G., and Uzsoy, R. Journal of Manufacturing Systems. 1997. 16(2). 102–116p.
  2. Lin F. R., Locascio A., and Shaw, M. J. Journal of Manufacturing Systems . 1997. 16.(2). 129–149p.
  3. Teng S. H. G., and Garimella S. S. Journal of Manufacturing Systems . 1998. 17(2). 87–96p.
  4. Crama Y., Klundert J. V. D., and Spieksma F. C. R. DAM Journal . 2002. 123. 339–361p.
  5. Ashayeri, J. and Selen W. European Journal of Operationa l Research . 2007. 183. 909–925p.
  6. Yilmaz I. O. , Gunther H. O., and Jain S. International Journal of Advanced Journal of Production Research and Management Volume 2, Issue 2, August 2012, Pages 43-59 ___________________________________________________________________________ ISSN: 2249–4766© STM Journals 2012. All Rights Reserved Page 59 Manufacturing Technology. 2009. 42. 335–347p.
  7. Crama Y., Flio O. E., Klundert J. V. D., et al. European Journal of Operational Research . 1997. 98. 457–472p.
  8. Lin, H., Fan Y., and Wu Y., and Ji P. International Journal of Advanced Manufacturing Technology . 2009.43.1189–1201p.
  9. Alisantoso D., Khoo L. P., Jiang P. Y. International Journal of Advanced Manufacturing Technology . 22. 2003.819–827p.
  10. Zandieh M., Dorri B., and Khamseh A. R. International Journal of Advanced Manufacturing Technology .
  11. Rossettia M. D., and Stanford K. J. A. Computers and Industrial Engineering. 2003. 45. 231–254p.
  12. Maimon O. Z., and Braha D. International Journal o f Production Research. 1988. 36(3). 761–784p.
  13. Wang, J. B., Wang, L. Y., Wang, D., et al. Journal of Allied Mathematics and Computation . 2009. 30. 293–304p.
  14. Loiacono, E. T. International Journal of Advanced Manufacturing Technology. 24. 2004. 919–924p.
  15. Agarwal, R., Tiwari, M. K., and Mukherjee, S. K . International Journal of Advanced Manufacturing Technology. 2007. 34. 584–593p.
  16. Ho, W., Ji. P., and Dey, P. K . International Journal of Advanced Manufacturing Technology. 2008. 37. 828–836p.
  17. Narayanaswami R., a nd Iyengar, V. International Journal of Advanced Manufacturing Technology. 2005. 26. 276–284p.
  18. Kennedy J., and Eberhart R. C. IEEE. 1995. 1942–1948p.

Read more of it

Subscribe to one journal or build your own list of several. One invoice, one payment, access for a full year.

Subscribe to journals →

Publish your article

Peer-reviewed journals across every subject, with open access options. Send your manuscript to the right editor today.

Publish with us → Calculate your APC
Support