International Journal of Rural and Regional Development Original Research

Root cause ananlysis of cost overrun in interior projects

  1. Avijit Halder Department of BEM, School of Planning and Architecture

Abstract

The construction industry is a path through which development of urban and rural India happens. The development of the project happens. The construction industry and its parties are associated with high degree of risk due to the nature of construction business activities, processes, environment and organization: Cost overrun is one of the most important problems in the construction one of the major problems faced by the construction industry is the cost overrun. The risk associated with the cost overrun for the stake holders are not defined which the root causes of the problems become. Therefore there is a need to study the root causes associated with the cost overrun and to solve the problem proactively to identify the real point of action to prevent the problem. Cost overrun is an unexpected increase in the money incurred in a construction project. Due to an underestimation of the actual cost of the project. The author has created a detailed analysis of the cause of cost overrun in Interior projects throughout the study of live case studies and arbitration and disputes. The Dissertation discusses in detail the causes of cost overrun in building projects .The thesis is a descriptive analysis of the causes of cost overrun in interior projects. Cost overrun is leading factor which affects the construction activities and it is more common in Fast track projects, the impacts of cost overruns are very high in developing countries fast track activities are much affected by cost overrun due to various factors throughout the project cycle. The deviations between the actual cost incurred during construction phase and primarily cost is known as cost overrun and it is one of the most predominant factors affecting the successful completion of the overall project, factors which are mostly influencing the cost overrun in interior fit-outs of mass construction projects and rank the factors identifies based on their impact mostly affecting the construction activities finally giving recommendations to overcome the critical factors

Keywords

References (29)

  1. A. M. F. Albtoush, “A Review on Causes of Cost Overrun in the Construction,” 2016.
  2. A. Balavenkatesh, “Analysis of Cost Overrun in Fast-Track Interior Fit-Out Projects,” 2017.
  3. V. Kasana, V. Paul and S. K. Solanki, “Framework for Rehabilitation of Buildings to Improve Health, Hygiene, and Comfort of Occupants,” INTERNATIONAL JOURNAL OF TOWN PLANNING AND MANAGEMENT, pp. 9, 38-46, 2022.
  4. H. Doloi, “Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects,” 2013.
  5. K. Kumar, C. Basu and V. K. Paul, “Utilization of Floats in Project Schedule Recovery- A Pilot Schedule Demonstration,” INTERNATIONAL JOURNAL OF CREATIVE RESEARCH THOUGHTS, pp. 3496 - 3502, 2020.
  6. E. Plebankiewicz, “Model of Predicting Cost Overrun in,” 2018.
  7. J. S. a. A. H. Yervi Hesna, “COVID-19 pandemic impact: an identification of the cause of cost overrun in construction project”.
  8. V. K. Paul, C. Basu, A. Rastogi and K. Kumar, Essentials of Building Life and Fire Safety, First ed., India: COPAL Publishing, 2021.
  9. K. Kumar, D. C. Basu, A. Rastogi and V. K. Paul, “Retrofitting the existing requirements for an institutional building Framework for Enhancing the Functionality,” IJSDR, vol. 5, no. 3, pp. 362- 368, 2020.
  10. N. D. a. M. S. Chinthaka Atapattu*, “Causes and Effects of Cost Overruns in Construction Projects,” 2023.
  11. J. BISMA, “ANALYSIS OF COSTOVERTURN IN FASTRACK RESIDENTAL BUILDINGS,” 2018.
  12. S. Das, A. Rastogi and K. Kumar, “Applicability of Risk Assessment Tools and Techniques for a Construction Project,” Journal of Research in Infrastructure Designing, vol. 4, no. 3, pp. 1-18, 2021.
  13. V. K. Paul, S. K. Solanki, A. Rastogi and P. S. Yadav, Establishing a Performance Index for Construction Project Managers, 1 ed., Taylor & Francis, 2022.
  14. S. Srivastva, “WHAT IS THE CAUSE OF DELAY IN RESIDENTIAL INTERIOR DESIGNING PROJECTS,” 2021.
  15. S. K. Solanki and V. K. Paul, “Comparison between service life prediction methods for building rehabilitation: application on a case study,” Journal of Building Pathology and Rehabilitation, pp. 1-13, 2022.
  16. N. Gupta, S. K. Solanki and M. Mittal, “Effectiveness of Amendment of GCC on Claims by CPWD in 2019,” International Journal for Research in Applied Science & Engineering Technology (IJRASET), pp. 3130-3146, 2022.
  17. R. Dasgupta, S. K. Solanki and V. Paul, “Post-pandemic impact on planning of district,” Int. J. Built Environment and Asset Management, pp. 162-182, 2021.
  18. V. K. Paul, C. Basu, A. Rastogi and K. Kumar, “Status of Fire Safety in Healthcare Facilities in India,” International Journal of Architecture and Infrastructure Planning; https://architecture.journalspub.info/index.php?journal=JAIP&page=index, vol. 8, no. 1, pp. 1- 11, 2022.
  19. V. Paul and K. Kumar, Risk and reliability assessment of fire and life safety in buildings- a case of healthcare building, New Delhi, India: FIREINDIA, 2021.
  20. K. Kumar and V. K. Paul, “A Critical Review of Risk Factors and Reliability Assessment Issues of Fire and Life Safety in Buildings,” NICMAR JOURNAL OF CONSTRUCTION MANAGEMENT, vol. XXXVII, no. III, pp. 23-33, 2022.
  21. K. Kumar and V. K. Paul, “Risk and Reliability Assessment of Smoke Control Systems in the Buildings,” International Journal for Research in Applied Science & Engineering Technology (IJRASET), vol. 10, no. X, pp. 576-581, 2022.
  22. K. Kumar and V. K. Paul, “Significance of Fire Protection System Reliability for Structure Fire Safety,” STRUCTURAL ENGINEERING DIGEST, no. October-December, pp. 42-25, 2023.
  23. E. Mishra and K. Kumar, “A Review of Environmental & Structural Impact of Courtyards in Hot and Humid Climate,” Journal of Housing and Advancement in Interior Designing, pp. 1-7, 2021.
  24. A. Lalit and K. Kumar, “Applicability of Shading Devices in Building Design for Reducing Heat; SSN: 2583-0228,” International Journal of Multidisciplinary Innovative Research, vol. 2, no. 1, pp. 20-25, 2022.
  25. A. Sharma and K. Kumar, “A Review of Barrier-Free Design in Built Environment,” International Journal of Multidisciplinary Innovative Research, vol. 2, no. 1, pp. 33-37, 2022.
  26. Pragya and K. Kumar, “A Review of Performance of Green Roofs for Retrofitting Existing Structures,” Journal of Research in Infrastructure Designing, pp. 1-7, 2021.
  27. M. Harit and K. Kumar, “A Critical Review of Expanded Polystyrene Core Panel System in Buildings in India,” Journal of Sustainable Construction Engineering and Project Management; , vol. 4, no. 3, pp. 1-7, 2021.
  28. S. P. WANJARI, “Identifying factors causing cost overrun of the construction projects,” 2016.
  29. B. A. K. S. P. Diksha Jadhav1, “Analysis of Factors Causing Cost Overruns in Residential Building Construction Projects,” 2020.
Support