A Comparative Study on Causes of Delay Incompletion of Construction Projects in OmanBy Mohammed A. Chasib Al Mohsin, Ali Alnuaimi
Abstract: The aim of this paper was to identify the problems resulting from the delays in completion of construction projects in Oman. A field study was conducted on a number of construction projects in Muscat area to collect data required for analysis. Two groups of projects were studied, the first group included projects constructed during the period 2007–2008 and the second group studied comprisedprojects constructed during the period 2009–2010. It was …