Journal of Construction Engineering, Technology & Management
Cost Objective Model for Construction Equipment Replacement Policies
Abstract
Most construction companies, particularly companies whose projects are primarily constructed with earthmoving equipment, depend heavily on their construction equipment fleets, which represent substantial locked capital investment and require acceptable utilization levels to recover expenses incurred and losses from this investment. The equipment, which possesses a finite physical and economic life, inevitably requires replacement, and equipment maintenance costs increase with the equipment life. Different methodologies are employed to establish the replacement schedules of construction equipment, including a cost optimization model that identifies the best schedule for optimizing (minimizing) expenses. This paper investigates the mechanics of one of the most widely used replacement analysis theories and its implementation in a practical and simple mathematical cost optimization model. This research develops an objective function, which utilizes data sheets provided by equipment manufacturers that can be applied to any type of heavy construction equipment. A Matlab program was employed as a decision-making computer-aided tool to assist the project manager or the procurement department in setting the replacement policies for the company projects.Keywords: construction equipment, earthmoving equipment, optimization modelReferences (12)
- Du Plessis C. Replacement Of Earthmoving Equipment At Surface Coal Mining Operations In South Africa . MBA Thesis. Gordon Institute of Business, University of Pretoria, Johannesburg, South Africa. 2007.
- Jaafari A, Mateffy VK. Realistic model for equipment rep lacement. Journal Construction Engineering Management, ASCE. 1990; 116(3): 514–32p.
- Hritonenko N, Yestenko Y. Integral Equation of Optimal Replacement . Applied Mathematical Modeling . 2009; 33(6): 2737–47p.
- Park CS, Sharp -Bette GP. Advanced Engineering Economics . John Wiley and Sons, Canada. 1990.
- Gransberg DD, Popescu CM, Ryan R. Construction Equipment Management For Engineers, Estimators and Owners . CRC Press, Boca Raton, FL. 2006.
- Peurifoy R, Schexnayder CJ, Shapira A, et al. Construction Planning, Equipment and Methods, 8th Ed n. McGraw Hill, New York, NY. 2010.
- Castro W, Castrillon O, Gonzales G, et al. A multi-criteria application for an equipment replacement decision. i=11% i=10% i=9% EUAC Useful life Journal of Construction Engineering, Technology and Management Volume 4, Issue 2 ISSN: 2249-4723 (online), ISSN: 2347-7253 (print) JoCETM (2014) 1-13 © STM Journals 2014. All Rights Reserved Page 13 Academic Journal, Ingenieriay Desarrollo. 2009; 25: 80–98p.
- Asgarpoor S, Jayakumar A. Maintenance optimization of equipment by linear programming, probability engineering . Information Science . Dept. of Electrical Engineering., Nebraska University, Lincoln, NE, USA. 2006.
- Hartman JC. A note on a strategy for optimal equipment replacement. Production Planning and Control. 2005; 16(7): 733–9p.
- Mathew S, Kennedy D. A strategy for optimal equipment replacement . Production Planning and Control . 2003. 14(6): 571–7p.
- Lubkov NV. Equipment life time optimization with respect to operational expenses. Automation and Remote Control. 2007; 69(5): 900–8p.
- Panneerselvam R. Operations Research , 2nd Edn. PHI Learning Pvt. Ltd., New Delhi, India. 2006.